8 d X 6 D Z Z Z Z r" T " " $ D " 2" 2" @ " " Z Z 6% 6% 6% " F Z Z 6% " 6% 6% " l C Z F4 8# 3 v ( 0 X # C C P 0 " " 6% " " " " " $ " " " X " " " " " " " " " " " " " X f : SECTION 260000 BASIC ELECTRICAL REQUIREMENTS Latest Update 03-10-2022. B. File Format: Coordination drawings shall be in a layered structure form as CAD Files or PDF Files for each floor with searchable text as follows: File Structure: The pdf or dwg files shall have separate layered structure for: Building Elements: Indicate each building element on separate layers, such as: Walls. Ends shall be capped with push plugs for future use. Emergency operations. PROTECTION OF WORK Protect work, material and equipment from weather and construction operations before and after installation. Refer to General Requirements of Division 01 for additional requirements pertaining to Submittals and Record Drawings. As part of instruction for operating equipment, demonstrate the following procedures: Start up. <>/ExtGState<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI] >>/MediaBox[ 0 0 595.44 841.68] /Contents 4 0 R/Group<>/Tabs/S/StructParents 0>> Environmental Sustainability }H5@Gj\/vLBh@.\=r+TKi3Eg:xI=V{ T`WiRcfJ1Et*kIPd$ItI}J&]IES&IKO>Snv! Training period shall be performed within one (1), two (2) week period. The contractor shall submit detailed riser diagrams detailing point-by-point connections. provided by the general contractor and/or his subcontractors shall be guaranteed and warranted to be free from defects in workmanship and materials for a period of two (2) years after date of certificate of completion and acceptance of work by UMB. WORK PERFORMANCE All electrical work must comply with the requirements of NFPA 70 (NEC), NFPA 70B, NFPA 70E, OSHA Part 1910 subpart J, OSHA Part 1910 subpart S and OSHA Part 1910 subpart K in addition to other references required by the contract. .2 This shall generally include work in the following areas: G.|,b43f`0pXaE"zs aN IBC (International Building Code). 3 electrical and mechanical specifications, specifications for electrical unit substation . P}a WNd|2Svk=vq!xKv!`,8h@ ` 8`M9e D `TD>'5m4dZppSs$+{43 ]EY Shut down. C. PROJECT OPERATION AND MAINTENANCE MANUAL ELECTRONIC FILES Project O & M Manual File: The project OM Manual shall include one (1) electronic copy of each approved submittal and any manufacturers maintenance manuals, and all warranty certificates included in Divisions 26, 27, & 28. endstream endobj 2010 0 obj <>stream Effective energy utilization. 0000003026 00000 n Maintenance. 1.2 REQUIREMENTS OF REGULATORY AGENCIES AND STANDARDS Unless otherwise modified, provisions of General Conditions, Supplementary Conditions and Division-01 govern work under the Electrical Divisions. service companies, and controlling agencies. Floor Pipe Sleeves Applications: Pipe sleeves are required for all new conduit risers passing through floor slabs. 3. XB^c*x=.l0 r Div. ANSI (American National Standards Inst.). 0 Corresponding floor plans showing only this particular system with conduit and wire runs between points. Shutdown. Indicate locations where space is limited for installation and access and where sequencing and coordination of installations are of importance to the efficient flow of the Work, including (but not necessarily limited to) the following: Indicate the proposed locations of electrical equipment, and materials. ELECTRICAL INSTALLATIONS General: Sequence, coordinate, and integrate the various elements of electrical systems, materials, and equipment. Room numbers. }SC8/(|X.8\NspWb].uHh8w/0>uxEu$H>THbhOZd4 Comply with requirements of governing regulations, franchised service companies, and controlling agencies. Sequence, coordinate, and integrate installations of mechanical materials and equipment for efficient flow of the Work. An electrical foreman, superintendent or other supervisor familiar with the project shall be in attendance for all scheduled electrical inspections. Existing Construction: All new service penetrations through existing rated assemblies shall be provided with a pipe sleeve and sealant materials. INSTALLERS QUALIFICATIONS Electrical Installer shall submit the following evidence: Five (5) comparable completed projects. EQUIPMENT PROVIDED UNDER ANOTHER DIVISION AND BY OTHERS The Installer of products under Divisions 26, 27, & 28 shall make all system connections required to equipment furnished and installed under another division and by others. Supplementary Conditions and Division-1 Specification Sections, apply to this Section. 4. <<8444751DFCD0354687F9FE76EBE71065>]>> The Contract Documents are a single integrateddocument, and as such all Specification Sections apply. 264 0 obj <> endobj DTW Works Master Specification Section 16061- Grounding -Primary Issued 2005/06/01 PART 1 GENERAL 1.1 RELATED SECTIONS .1 Section 16010 - Electrical General Requirements. 8&Zdl6xHc`p(N:cy$f430o"NNN_r u2Mrf\[7Hcr hb```x ,M[Vcv/?LyS:wIf{[zX#F2\3vdzDlLt0t0 h )@" 110wc {_1``Y P Deliver all certificates to the Owner prior to final acceptance of work. INSPECTIONS Contractor shall: Schedule, pay for (as applicable) and attend all inspections required by the Authorities Having Jurisdiction. REPAIRS & RESTORATION OF SURFACES AND FINISHES: Restore all finishes, equipment and surfaces to original condition, where affected by the work. APPROVED EQUAL EQUIPMENT LAYOUTS Approved Equal Equipment Layouts: The equipment layouts and the related mechanical and electrical service connections, access space and supports indicated on the construction documents represent equipment provided by the specified basis of design manufacturer and model number. Place grout on concrete bases to provide a smooth bearing surface for equipment. Omission of words or phrases such as "the Contractor shall", "as shown on Remove all electrical clippings, wiring, nuts, bolts, etc. PART 1 GENERAL RELATED DOCUMENTS Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this section and all other Electrical Specification Sections. NEMA (National Electrical Manufacturers Association). Housekeeping Pads: Pads shall be minimum of four (4) inches wider and longer than structural base of equipment being set on pad. left on top of ceilings and ceiling tiles. B. English Deutsch Franais Espaol Portugus Italiano Romn Nederlands Latina Dansk Svenska Norsk Magyar Bahasa Indonesia Trke Suomi Latvian Lithuanian esk . endstream endobj 575 0 obj <>stream Also turn off Underlines.) Include the following: Planned electrical systems layout, including conduit elbow radii and accessories. RECORD DRAWINGS (As Built) Upon completion of the electrical installations, the Installer shall deliver to the Architect one (1) complete set of marked-up blueprints of the electrical contract drawings. 896 0 obj <>/Filter/FlateDecode/ID[<4733E1E0B7D7784ABE416F9437B1A7ED><5C11778FF49F854BA974624463381FF3>]/Index[878 27]/Info 877 0 R/Length 92/Prev 228199/Root 879 0 R/Size 905/Type/XRef/W[1 3 1]>>stream hb```b````a``eg@ ~f(0wPN A8.I.qk``Fx6I Concrete shall be 3,500 psi twenty-eight (28) day compressive strength concrete and reinforcement bars as specified in the architectural specifications. SECTION 16010 - GENERAL PROVISIONS SECTION INDEX 1.0 General Conditions 12.0 General Description 13.0 Work Included 24.0 Codes, Inspection, Permits and Fees 35.0 Record Drawings 36.0 Shop Drawings, Samples and Other Submittals 47.0 Coordination 58.0 Minor Modifications 59.0 Guarantee 6 10.0 Approvals, Substitutions, Etc. Identification systems. "$u D2iH>`:\ &Ea We also use third-party cookies that help us analyze and understand how you use this website. All submitted materials and equipment are subject to approval by the A/E and UMB. DEMONSTRATION AND INSTRUCTIONS Demonstrate operation and maintenance of equipment and systems to Owners personnel a minimum two (2) weeks prior to date of final inspection. Distribution panels. 1.2 Page 1 of 4 REFERENCES .1 American National Standards Institute/Institute of Electrical and Electronics Engineers (ANSI/IEEE). Follow supported equipment manufacturer's setting templates for anchor bolt and tie locations. Install identifying devices prior to installing acoustical ceilings and similar concealment. In default thereof, owner may have such work done and charge the cost of same to the contractor. Unless otherwise indicated in each specification section, contractors may submit material and equipment by non listed manufacturers provided said submittals meet the requirements of these specifications. 584 0 obj <>/Filter/FlateDecode/ID[<68D0A66D69CDF1FFF7626FF3652144DE><5293A0C1E7B0C14DBF1945BCD9C7F14E>]/Index[571 20]/Info 570 0 R/Length 71/Prev 500049/Root 572 0 R/Size 591/Type/XRef/W[1 2 1]>>stream E. Test Data . Cut such items flush with masonry surfaces. Approved substitutions, Contract Modifications, RFI responses and actual equipment and materials installed. Electrical Performance Specifications Skagway Bazaar Building - Skagway, Alaska Page 1 of 10 . c $ ) p@P ! %%EOF Operation. endstream endobj 4189 0 obj <. hbbd``b` $V Fg $s6e"A?a)L:= S ` + 11275 0 obj <>/Filter/FlateDecode/ID[<1BCD9CA6C4893D4A874390606B4A9A2F>]/Index[11261 22]/Info 11260 0 R/Length 76/Prev 791633/Root 11262 0 R/Size 11283/Type/XRef/W[1 2 1]>>stream All submitted materials and equipment are subject to approval by the A/E and UMB. %%EOF @W|$" Coordinate requirements for access panels and doors where electrical items requiring access are concealed behind finished surfaces. DIVISION 16 SECTION 16010 ELECTRICAL BASIC ELECTRICAL MATERIALS AND METHODS 16010 - 1 PART 1 - GENERAL 1.01 CONTRACT DOCUMENTS A. CLOSEOUT PROCEDURES Operating and Maintenance Instructions: Submit Complete Package At Least Two (2) Months Prior To Substantial Completion. Noise and vibration adjustments. Refer to Division 01 Section "Definitions and Standards" for definition of "experienced Installer." Cut, remove and legally dispose of selected electrical equipment, components, and materials as indicated, including but not limited to removal of electrical systems and equipment as indicated on the drawings and specifications and other electrical items made obsolete by the new Work. This website uses cookies to improve your experience while you navigate through the website. Adjustment. This category only includes cookies that ensures basic functionalities and security features of the website. endstream endobj 572 0 obj <> endobj 573 0 obj <> endobj 574 0 obj <>stream 0000000596 00000 n COMAR (Code of Maryland Regulations). 4 | SECTION-16000 1.02 A. 1 0 obj Submit the work permit with the outage request. It shall be the responsibility of the Installer to obtain all necessary data from the equipment supplied under other Divisions. Prospective subcontractors under this section are cautioned that the unauthorized operation of electrical equipment or other control devices by their personnel can result in extremely serious consequences for which the contractor will be held accountable. Provide and maintain temporary partitions or dust barriers adequate to prevent the spread of dust and dirt to adjacent areas. GUARANTEE/WARRANTY: All materials, equipment, etc. DEMOLITION: Remove and dispose of all existing materials not required for re-use or reinstallation. .2 Section 01810 -Commissioning. endstream endobj startxref %PDF-1.5 % Compliance with the requirements of NFPA 70E is subject to ongoing inspection by University personnel and failure to comply will result in an immediate Stop Work order being issued and enforced at the contractors expense. GROUT Grout shall be non-shrink, high strength type, free of iron or chlorides and suitable for use in contact with all metals, without caps or other protective finishes complying with ASTMC1107, GradeB and the following: Characteristics: Post hardening, volume adjusting, dry, hydraulic cement grout, nonstaining, noncorrosive, nongaseous, and recommended for interior and exterior applications. Hazards. In addition to the requirements specified in Division 1, the following requirements apply: Protection of Installed Work: During cutting and patching operations, protect adjacent installations. Provide forms for placement of grout, as required. With super-finished raceways and controlled geometries, our premium design helps ensure consistent quality. Verify all dimensions by field measurements. NFPA (National Fire Protection Association). . The contractor shall include in his price the cost of all premium time required for outages and other work which interferes with the normal use of the building, which will be performed, in most cases, during other than normal work time and at the convenience of the University. They accommodate radial and axial loads in both directions, are easy to mount, and require less maintenance than many other bearing types. Review contents of manual and video with personnel in detail to explain all aspects of operation and maintenance. No additional compensation will be made to the contractor as a result of his failure to familiarize himself with the existing conditions under which the work must be performed. Design Mix: 5,000psi (34.50MPa), twenty eight (28) day compressive strength. Remove conduit, hangers, supports, etc. 611.0 Acceptance Test 612.0 %PDF-1.6 % Div. %%EOF Samples shall indicate applicable specification Listing and Labeling Agency Qualifications: A Nationally Recognized Testing Laboratory (NRTL) as defined in OSHA Regulation 1910.7. Pa>hRjf4L4)@5C'2O4)@5C'^T3}2-IT3}2-Iid>qd|'2.@5C'2& 1? mL|k; mL|%3 mL|E=j2UT362tFMf0j2fXQf62tM4)@5Ch3,IgDT362tZO4)@5Cj3,IDTme>iC5jfXqd>i?j2m4|z7j2Ou|GVvx6p+j6*|orw~~qyri{7g2a AoO{z'ZwoFOP1p(Cs&.8dnvr{x8^|\hyuba4w/Axu (p8g\n4d,K%T?Hd2nZirM0%H K y}?3S}~I4H>_yUuSxIZ C7F"T!5b~Q0; afdb`dg4baTfX:r-X5)H! trailer +"Y3`pHw]|Gq{5ST>#;@ @FF hb```,lleaX 0p7Q;0"cuLfJ 'f`^a]Qp@q 2pJHHX)3DX8\n*p. ZPwPEgjZv]QO^pV0VUE:/(@HaW#Zld$Wvm#*.fvRT!y>.eu NzL2,:JiXQ4A76r,go$r:E)&UnW /L_CB!wmS9w*y*e@cOyWKm\-"/$JRX ?wPY/p At a minimum, prepare coordination drawings for all mechanical rooms, electrical rooms and substation rooms. Show all access doors for concealed junction boxes devices. General Specification for Electrical Works Abu Dhabi Sewerage Services Company ADSSC/GSEW Division 16 Section 16010 Electromagnetic Compatibility (EMC) Rev: 02 Jan. 2011 Page 6 of 7 6. Provide acoustical caulking to seal the annular spaces between the sleeve and the bare pipe or pipe insulation on each end with one half (1/2) inch caulking all around the annular space. %PDF-1.5 OUTAGES For all work requiring an outage, the electrical contractor shall submit an outage request to the UMB Project Manager, using the UMB Standard Request for Outage Form which is available through the UMB Design and Construction Web Site at HYPERLINK "https://www.umaryland.edu/designandconstruction/design-and-construction-documents/umb-standard-project-forms---current-editions/" https://www.umaryland.edu/designandconstruction/design-and-construction-documents/umb-standard-project-forms---current-editions/ The existing mechanical/electrical systems shall remain operational unless turned off by University personnel during the construction of the project. 11261 0 obj <> endobj Provide suitable cover plates for all recessed back boxes of equipment removed and not covered by new devices. You also have the option to opt-out of these cookies. All communication shall be through this person. 904 0 obj <>stream For compressorized equipment include an additional three (3) year Guarantee/Warranty Period. Perform cutting, fitting, and patching of electrical equipment and materials required to: Uncover Work to provide for installation of ill timed Work. endstream endobj 11262 0 obj <>/Metadata 429 0 R/Outlines 455 0 R/PageLayout/OneColumn/Pages 11222 0 R/StructTreeRoot 1524 0 R/Type/Catalog>> endobj 11263 0 obj <>/Font<>>>/Rotate 0/StructParents 0/Type/Page>> endobj 11264 0 obj <>stream 0000001264 00000 n hb```f``2c`a``cc@ >+PRQ0yXgZ-*``z=;K7<72a`19 7h9EmGn6]lyjz\t^io K7] 7x9L+N$ ?ylU#^yr08-;dg{w.\6%n#{6k5SnLl2sP$k$GI,2L Install systems, materials, and equipment level and plumb, parallel and perpendicular to other building systems and components, where installed exposed in finished spaces. All work in Divisions 26, 27, and 28 shall comply with the latest version of following codes and regulations as adopted by the State of Maryland and the State Fire Marshal, unless otherwise specified. Install electrical equipment to facilitate servicing, maintenance, and repair or replacement of equipment components. Certificates shall include statements of applicability, certifying reports from governing agencies, industry standards, and testing agencies and applicable certificates specified in each section of the specification. This website or its third-party tools use cookies. But opting out of some of these cookies may have an effect on your browsing experience. %PDF-1.5 % shall meet the requirements of the associated spec section(s). Include a detailed review of the following items: Maintenance manuals, including a customized list of preventive maintenance items and annual schedule for maintenance. Trouble shooting. Remove wiring and conduit back to source panelboard or switch, or to last remaining device on the circuit. Each section of raceway must contain an equipment grounding wire bonded at each end and sized as required. Size and location of all electrical panels. Servicing. TURF CLUB 16010-1 GENERAL PROVISIONS MASTER F:\WORDPROC\ZEIJOBS\883-001\16010 SECTION 16010 GENERAL PROVISIONS PART 1 - GENERAL Related Documents: Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to this section. 16 ELECTRICAL GENERAL REQUIREMENTS Section 16010 434-2007 Page 1 of 1 _____ INDEX OF SPECIFICATION 16010 Electrical, General Requirements 16122 Electrical, Wire and Cable 16133 Electrical, Conduits and Fittings 16225 Electrical, Control Panel . 1.08 TESTING A. This instruction shall be in addition to instructional requirements of specific equipment specified elsewhere in the mechanical specifications. Single row deep groove ball bearings are particularly versatile, have low friction and are optimized for low noise and low vibration, which enables high rotational speeds. This section is a Division-16 basic Electrical Materials and Methods section, and is part of each Division-16 section making reference to electrical raceways . stream This Section of the Specifications and its accompanying Drawings are made When the successful bidder chooses to provide or approved equal equipment by one (1) of the other listed manufacturers in the specifications, the bidder shall be responsible for providing all adjustments and modifications to the services necessary to make connections to the equipment, the bidder shall be responsible for installing the equipment such that all required clear access space is maintained, and the bidder shall be responsible for providing all adjustments and modifications to the equipment mounting and supports. Prepare reflected ceiling plans to coordinate and integrate installations, air outlets and inlets, light fixtures, communication systems components, cable trays, sprinklers, access doors and other ceiling mounted items. The Terms Listed and Labeled: As defined in the National Electrical Code, Article 100. All such outages shall be performed on other than normal duty hours. &F >`>a$gd$ ^ gd;F $ Samples shall include physical examples of materials; in complete units for visual inspection. View Specification PDF - The Pennsylvania Turnpike. Coordinate connection of electrical services. Deliver on the premises, where directed, existing material and equipment which is to be salvaged and remain property of Owner. }T+A&p~lA&K9V=Zp-8ysG.n{@K?zpW\{\ZZgZU%]M:z ^HsRoiSD-G[ 5#)\EENX6 Refer to specification Section 16010 - "Basic Electrical Requirements: for complete work scope. Deep groove ball bearing. Narrow Section Ball Bearings (16000, 16100). 4206 0 obj <>/Filter/FlateDecode/ID[<3C9B520689C7864B9A48B04B8892C8F0><70969F182CD17F458CE0C92FB6F87795>]/Index[4188 97]/Info 4187 0 R/Length 96/Prev 405976/Root 4189 0 R/Size 4285/Type/XRef/W[1 3 1]>>stream l2f71S-K#C@EM{Wtq ph p haP haU B*ph haP h8 B*ph haP haP B*ph h B*ph h"p B*ph h& B*ph hlg B*ph h+V B*ph h"S{ ho h"S{ h9}- h{\V h8 h[P h8 h9}- h8 h#y h"S{ h#y / j Mandatory Requirements: The following requirements are mandatory: Protective Equipment: Electricians must use full protective equipment (i.e., certified and tested insulating material to cover exposed energized electrical components, certified and tested insulated tools, etc.) 1.01 . Section 16151 - Vertical Hollowshaft Electric Motors . SECTION 16010 BASIC ELECTRICAL REQUIREMENTS . &. Reimbursement shall be made by deducting the Architect/Engineer fee from the Contractor's final payment. ph p hf h8 >*B* Reflected ceiling plan. hSmk0+q7Pt%i!4GK~ ?lat"=Ye vydw \CnnXVmTG.1IgFb3muJ M6[]\.I!M{S}/Upc_Ov>Il/tc@U(Bvf-+u=oga$a #c.OyY7;njc dQ)lvy 7J As]S97}y9/7Qu{w}Sc1^~w/(omZB;.2 }@qQ Mg=?X2Wqg?p0O/&swW7qrdS&~ `Owe ]NXzN&~hQE2vJcU#BgO# E BICSI and NICET certification, where required by these specifications. PART 2 PRODUCTS LISTED MANUFACTURERS: Listed Manufacturers: The listed manufacturers indicated in Part 2 of each specification section as the basis of design represents the minimum level of quality for materials and equipment that is acceptable to UMB. Services include: Electrical penetrations include conduits and cables. % Provide larger trim or cover plates for new devices, where old back boxes, holes, etc. Switch Gear. Avoid air entrapment when placing grout. 0000003103 00000 n SECTION 16010 - GENERAL PROVISIONS 1.0 GENERAL CONDITIONS: All sections under this Division shall be subject to the requirements of the Architect's General Conditions - UAP Doc. Both riser and floor plan shall indicate address of devices where applicable. These cookies will be stored in your browser only with your consent. Single strip, continuous, flexible interlocked, double-wrapped steel, galvanized inside andoutside, forming smooth internal wiring channel. %PDF-1.6 % Also include the address, phone number and contact person for each supplier. The lighting design shall have a cross-section of 2,5 mm and a circuit breaker of (1 x 10 A + N) - Minimum wire size shall be 2.5 mm. Product data as specified in the electrical specifications unless otherwise noted: Warranties and maintenance instructions shall be included in the O & M Manual only. Fire rated wall and floor penetrations. In general, work includes, but is not limited to, the following: 2013 0 obj <>/Filter/FlateDecode/ID[<7A92318D9A66904D9BE2AA2059D48142><9E5BD34DD47A4B4CACDF0D2F3CF07D4E>]/Index[2006 15]/Info 2005 0 R/Length 55/Prev 136060/Root 2007 0 R/Size 2021/Type/XRef/W[1 2 1]>>stream Sizes and location of required concrete pads and bases. <>>> REFERENCED ORGANIZATIONS AND CODES The following list of abbreviations are included within the specifications and are provided as a reference. Cure placed grout according to manufacturer's printed instructions. Any conduit abandoned in concrete slabs, walls, or other inaccessible locations shall be left with a nylon pull wire. Conduit may remain to be reused for new work provided it is of the specified size and type and in condition acceptable to UMB. The convenience socket outlet and exhaust fan shall have a cross section of 4mm and a circuit breaker (1 x 16 A + N) unless otherwise mentioned on drawings. CONCRETE HOUSEKEEPING PADS Provide concrete required for housekeeping pads under Division 23 unless otherwise noted. 571 0 obj <> endobj ph p h8 B* SECTON 16010 - GENERAL PROVISIONS 16010 - General Provisions.doc PART 1 GENERAL 1.01 Work Included .1 Provide all labour, materials, equipment, services and supervision required to provide a complete electrical system as listed herein and shown on the drawings. 16010 - 1 . Cleaning. ph p he h;F B* CUTTING AND PATCHING General: Perform cutting and patching in accordance with Division 1 Section "Cutting and Patching." 2.0 GENERAL DESCRIPTION: A. This instruction period shall consist of not less than five (5) eight (8) hour days. CONCRETE HOUSEKEEPING PADS COORDINATE CONCRETE WORK WITH DIVISION 3. 6glqqS6&2S0gW Electrical inspection shall be by the [third (3rd) Party Inspector approved by the Maryland State Fire Marshall] [UMB inspection department personnel]. hb```,G@(b``oI product data and shall indicate applicable specification section and item numbers. SITE VISIT Prior to preparing the bid, the electrical subcontractor shall visit the site and become familiar with all existing conditions. Examples of Sub Systems: Normal Power. hbbd``b` $Z ~BARD0 !LAF10t' 1.1 GENERAL REQUIREMENTS: A. 16010 - 1 . ["R2VhL"F{V>,r&!#NLefBRD49e6D0u4$KyL !dU00BR0Cv1 n ~F ~ F. Supply Voltage This includes but is not limited to updating Equipment and/or Material Model Numbers indicated in the specifications and adding any additional specifications that may be required by the project. 0 UL (Underwriters Laboratories). Before shipment, the power distribution panel boards, shall be tested to ensure proper operation and conformance with manufacturer's published specifications. COORDINATION DRAWINGS General: When required participate in the preparation of the coordinated drawing effort for the project. Indicate scheduling, sequencing, movement, and positioning of large equipment into the building during construction. The hot work permit copy shall remain on the job site at the hot work location until such work is completed at which time the permit shall be returned to Environmental Health and Safety. 2006 0 obj <> endobj See Architectural Specification Division 07, Section Penetration Firestopping for sealant material requirements. Systems and Sub Systems: Indicate each system or sub system as warranted by congestion or complexity on separate layers such as: Examples of Systems: Lighting System. The operation of electrical equipment; required to achieve an outage must be accomplished by University personnel only. hbbd``b`$f n2 w}L %X0 8 Remove conduit, hangers, supports, etc. M0*``mvle}vw$ms3s%)[Fpk, V7#`,kzp:dM b([0.@Sk8@KGq4EY2:":@DD L'czU4,f53( iX 89

Bullnose Step Edge, Poland Spring Water Donation Request, Will Btt Reach 1, Articles S